Installation of 354 Solar Panels at Tritech’s Ulverston Office now complete!
The Ulverston site was designed in 2014 with solar panels in mind. Using solar generation is likely to be the single most effective carbon reduction action we can take. It provides 68% of current electricity consumption plus modest sales to grid.
Alastair Mitchel, Operations Director, Tritech International comments: "Installing solar power generation at the Ulverston site was always envisaged as a second phase when the factory was built in 2014. Our acquisition by General Oceans in October 2022 was the catalyst to go ahead with this investment and we are really proud to be taking this significant step to reducing our carbon footprint."